The methodology ladder
Every Plexus result fits one of four categories that tell you who is responsible and what must happen next: a desktop calculation, a practitioner's judgment, specialist work, or an agency determination.
This tool helps professionals prepare and organize environmental-review work; it does not issue determinations, which remain with the lead agency, and is not legal advice.
The four rungs
The rungs do not measure difficulty or confidence; they show whether Plexus, the practitioner, a specialist, or the lead agency is responsible for the item.
Plexus is answerable for the arithmetic.
On this rung, for example: Trip generation and the CEQR screening thresholds; Water demand and sewage generation in gallons per day; Solid waste in tons per week; Energy in source BTU per year; School seats, distances to mapped features, lot and zoning readouts.
You decide; Plexus assembles what you need to decide.
On this rung, for example: Which study areas the review should cover, and how wide; Whether a screening result warrants a fuller analysis; What comparable reviews imply for this site; A project fact we do not hold, such as an employee count or a unit mix; Which of the open items must be resolved before filing.
A licensed or qualified professional is answerable.
On this rung, for example: Wetland delineation and a jurisdictional determination; Phase I ESA, and Phase II sampling if it is indicated; Ambient sound measurements; Peak-hour turning-movement counts, signal timing and lane geometry; Archaeological and architectural resource investigation.
The lead agency is answerable, never Plexus.
On this rung, for example: The determination of significance, negative or positive; Whether an environmental impact statement is required; Scope adequacy, and acceptance of a filing; Lead agency designation itself.
Rung 1, in detail
Plexus can calculate a result when the method and the figures it needs are on file. That alone does not show the result agrees with a study prepared by a professional.
We label every calculated result as a planning estimate until it has been tested against filed studies and met a published standard, and we show the standard, sample, result, and limitations for each test.
One of 21 study types has a calculation that met a standard set before testing. That result must be tested again under the current sample-size requirement. All other calculated results are labelled as planning estimates.
| Solid waste and sanitation services | Met the standard, on too few cases | Tested against 5 filed studies. The median difference was 6.9%, compared with a standard of 15% set before testing. |
| Water demand and sanitary flow | Did not meet the bar | Tested against 8 filed studies. The median difference was 17.1%, compared with a standard of 15% set before testing. |
| Energy demand | Did not meet the bar | Tested against 5 filed studies. The median difference was 65.1%, compared with a standard of 30% set before testing. |
Previously passed a five-case check; not yet tested against the current eight-case minimum. The minimum was raised to eight cases on August 27, 2026. The solid waste and sanitation services test predates that change and must be run again before it can meet the current standard.
Not yet compared at all: Traffic, Traffic impact study (level of service), Community facilities, Greenhouse gas emissions, Noise, Open space. These calculations show their methods and the figures they use, but they have not been tested against filed studies.
Saved snapshot generated September 30, 2026 from study list version 2026-08-24, and the table below checks for current figures and identifies whether it is showing live data or the snapshot.
The table below shows what Plexus can calculate or organize for each study type, including any calculation that did not meet its test standard.
Plexus currently supports 21 technical study types. 9 include a planning calculation, and 1 of those has met the current test standard. The other 12 are organized as sourced review work rather than calculations.
The result is calculated from a published method and the project's own figures, and the calculation met its published test standard against filed professional studies.
| Study | Source or method | Comparison with filed studies |
|---|---|---|
| Solid waste and sanitation services | Source material on file. CEQR Ch. 14, 22 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Met the standard, on too few cases. Tested against 5 filed studies. The median difference was 6.9%, compared with a standard of 15% set before testing. Previously passed a five-case check; not yet tested against the current eight-case minimum. |
The result is calculated from published methods and rates. It carries the figures used and their sources, but testing against filed studies is not complete.
| Study | Source or method | Comparison with filed studies |
|---|---|---|
| Traffic trip generation and the Ch. 16 screen | Source material on file. CEQR Ch. 16, 270 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Comparison with filed studies is pending. |
| Traffic impact study (level of service) | Source material on file. hcm_los.py, los_screen.py | Comparison with filed studies is pending. Specialist or field input: Peak-hour turning-movement counts, Signal timing and lane geometry. |
| Community facilities schools | Source material on file. CEQR Ch. 6, 26 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Comparison with filed studies is pending. |
| Water demand and sanitary flow | Source material on file. CEQR Ch. 13, 13 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Did not meet the standard. Tested against 8 filed studies. The median difference was 17.1%, compared with a standard of 15%. |
| Energy demand | Source material on file. CEQR Ch. 15, 5 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Did not meet the standard. Tested against 5 filed studies. The median difference was 65.1%, compared with a standard of 30%. |
| Greenhouse gas emissions | Source material on file. CEQR Ch. 18, 28 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Comparison with filed studies is pending. |
| Noise CEQR screening and attenuation | Source material on file. CEQR Ch. 19, 20 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Comparison with filed studies is pending. Specialist or field input: Ambient sound measurements. |
| Open space | Source material on file. CEQR Ch. 7, 32 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | Comparison with filed studies is pending. |
The study question, relevant rules or guidance, and material needed are identified, and the final column lists any missing information or specialist work.
| Study | Source or method | Information or work still needed |
|---|---|---|
| Environmental justice | Source material is still needed. Required source: The CP-29 screening steps, and a method for the consideration ECL 8-0113 requires. The State's designated-DAC list is no longer outstanding: `dac.screen` reads it at request time. What is missing is a method, and CEQR Ch.23 s 300 records that DEC's rulemaking implementing 6 NYCRR 617 was not final when the chapter was written, so no published one exists to encode. | Figures still needed: EPA EJScreen indicators |
| Land use, zoning and public policy | Source material is still needed. Required source: District use and bulk rules as data — NYC Zoning Resolution first, then the municipal codes behind the Part VII campaign | Figures still needed: Use and bulk rules for that district |
| Shadows | Source material is still needed. Required source: CEQR Ch. 8 shadow screening geometry (tier 1/2/3 screens and the four analysis days) | Figures still needed: Building height, Building footprint |
| Transit and pedestrians | Source material is still needed. Required source: CEQR Ch. 16 modal split and transit trip assignment factors, encoded as a catalog | Figures still needed: Transit stops, routes and headways |
| Stormwater and water quality | Source material is still needed. Required source: NYSDEC Stormwater Management Design Manual — water quality volume, runoff reduction, sizing criteria | Figures still needed: Design rainfall depths |
| Air quality screening | Source material requires verification. The published method will be cited in the workspace after reconciliation with its source catalog. | Figures still needed: Parking spaces, Heating fuel and floor area, Distance to the nearest receptor |
| Climate and flood resilience | Source material is still needed. Required source: NYS sea level rise projections (6 NYCRR Part 490) and the ClimAID design tables | Figures still needed: Sea level rise projection for the region |
| Wetlands, habitat and species screening | Source material on file. geodata.py, spatial_analysis.py | Fieldwork still needed: Wetland delineation, Natural Heritage response, and any survey it asks for |
| Historic and archaeological screening | Source material on file. geodata.py | Figures still needed: Archaeological sensitivity |
| Hazardous materials screening | Source material on file. geodata.py | Fieldwork still needed: Phase I ESA findings, Phase II sampling results |
| Socioeconomic conditions and displacement | Source material on file. CEQR Ch. 5, 77 entries, every quote located in the source PDF Manual reconciliation with the published source is pending. | no backtest has been run against real studies from the corpus |
| Urban design and visual resources | Source material is still needed. Required source: A viewshed method: terrain, the structure's envelope, and the convention for choosing representative viewpoints. CEQR Ch. 10 for the city and NYSDEC Program Policy DEP-00-2 for the State describe what an assessment contains; neither publishes a computation to encode. | Fieldwork still needed: The structure's height and bulk, Panel height, row spacing and screening, for an array, Photographs from agreed viewpoints |
Showing a saved snapshot, generated September 30, 2026, while current figures are being checked. Study list version 2026-08-24. The following rows also draw figures from public services queried at the time of a screening rather than from data held here, so those lookups are unconfirmed while this page is showing stored figures: Traffic, Community facilities, Water demand and sanitary flow, Solid waste and sanitation services, Open space, Environmental justice, Shadows, Transit and pedestrians, Stormwater and water quality, Climate and flood resilience, Wetlands, habitat and species screening, Historic and archaeological screening, Hazardous materials screening, Socioeconomic conditions and displacement, Urban design and visual resources.
Read the measurement record for the test runs, cases, limitations and withdrawn results.
Rung 4
An earlier version of Plexus used comparable reviews to estimate how an agency might decide, but we removed that feature after testing showed it did not provide a reliable prediction.
Plexus still shows comparable reviews to help a practitioner understand the process and investigate relevant issues, but does not turn those outcomes into a prediction; the lead agency makes the determination for the project before it.
Why the record is kept this way
Each item keeps its project facts, source, and next action: a calculation carries its figures, method, assumptions, and result; a practitioner question carries the regulation or guidance behind it; specialist work carries the request and finished study; and an agency decision carries the filing, response, and date.
This lets the team see what changed, what supports a draft, and what remains open, and lets a reviewer trace any result back to its source.
Scope
Plexus is designed for SEQR statewide and CEQR in New York City, most useful at the start when the team needs to establish the review path and work plan, and it continues to hold the record as the project changes.
If something on this page is wrong or out of date, please tell us.